Smart Work Zone SOPs

Client MassDOT    Location Massachusetts    Duration 2012 - 2013   

KCUS assisted MassDOT with the development of Standard Operating Procedures (SOPs) for Smart Work Zone (SWZ) deployments across the state. These standard operating procedures will be used by MassDOT and Contractors to decide what types of projects warrant SWZ installations, determine which devices should be deployed, and collect consistent data for performance management.
The Standard Operating Procedures document developed by KCUS will be used to improve safety and mobility through highway construction areas by providing a basis for the deployment of future SWZs statewide in a consistent manner.